Skip to content

Project Meeting 2018.12.28

Ben Stabler edited this page Dec 28, 2018 · 9 revisions

Shadow pricing

  • Includes both CT-RAMP (multiplicative) and DaySim (additive) calculation method
  • See code here and example config file
  • Runtimes for 10 iterations:
school_location : 937.825 seconds (15.6 minutes)
workplace_location : 2038.713 seconds (34.0 minutes)
  • Results converging for 100% sample
  • Need to update documentation

Individual value of time

Verification

  • Still waiting on full TM1 example setup and code from @Lisa
Clone this wiki locally