Skip to content
Triggered via pull request November 2, 2024 17:27
@tarampampamtarampampam
synchronize #583
v2
Status Cancelled
Total duration 1m 33s
Artifacts

tests.yml

on: pull_request
Test and lint (backend)
24s
Test and lint (backend)
Test and lint (web)
45s
Test and lint (web)
Check for GitLeaks
9s
Check for GitLeaks
Matrix: build-app
Build the docker image
34s
Build the docker image
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Build for darwin (arm64)
Process completed with exit code 254.
Build for darwin (amd64)
Process completed with exit code 254.
Build for windows (amd64)
Process completed with exit code 254.
Build for linux (arm64)
Process completed with exit code 254.
Build for linux (amd64)
Process completed with exit code 254.
Build for windows (arm64)
Process completed with exit code 254.
Build the docker image
Canceling since a higher priority waiting request for 'refs/pull/583/merge' exists
Build the docker image
The operation was canceled.