Skip to content

flake.lock: Update #734

flake.lock: Update

flake.lock: Update #734

Triggered via pull request December 15, 2024 00:58
Status Failure
Total duration 2m 11s
Artifacts

ci.yaml

on: pull_request
Matrix: nix
Matrix: nixos
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 3 warnings
check
Process completed with exit code 1.
nixos (micro)
Process completed with exit code 1.
nixos (poirot)
The job was canceled because "micro" failed.
nixos (poirot)
The operation was canceled.
nixos (nano)
The job was canceled because "micro" failed.
nixos (nano)
The operation was canceled.
nix (otavio@generic-x86)
Process completed with exit code 1.
check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
nixos (micro)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
nix (otavio@generic-x86)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636