[QNN EP] Fix multithread sync bug in ETW callback #23156
+49
−47
Merged
Azure Pipelines / Linux DNNL CI Pipeline
succeeded
Dec 19, 2024 in 1h 30m 8s
Build #20241219.15 succeeded
Details
- Failed: 0 (0.00%)
- Passed: 10,302 (99.93%)
- Other: 7 (0.07%)
- Total: 10,309
Loading