Skip to content

wip

wip #25

Triggered via push December 27, 2023 02:08
Status Failure
Total duration 56s
Artifacts

go.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (1.20): provisioning.go#L33
no required module provides package github.com/beeper/libserv/pkg/requestlog; to add it:
test (1.20)
Process completed with exit code 1.
test (1.21)
The job was canceled because "_1_20" failed.
test (1.21)
The operation was canceled.
lint: provisioning.go#L33
no required module provides package github.com/beeper/libserv/pkg/requestlog; to add it:
lint
Process completed with exit code 1.