Skip to content

Docs: Improve Helm docs usability #36816

Docs: Improve Helm docs usability

Docs: Improve Helm docs usability #36816

Triggered via pull request November 30, 2024 17:20
Status Cancelled
Total duration 5m 36s
Artifacts 2

test-build-deploy.yml

on: pull_request
prepare
7s
prepare
doc-validator
12s
doc-validator
test-docs  /  test-docs
29s
test-docs / test-docs
goversion
29s
goversion
Matrix: test
Matrix: integration-alpine
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

22 errors
doc-validator: docs/sources/helm-charts/mimir-distributed/configure/configure-gem-federation-frontend.md#L17
[doc-validator] reported by reviewdog 🐶 The link '{{< relref "./configure-grafana-enterprise-metrics" >}}' references a page in the project that doesn't exist. Check if the page has moved within the repository. Verify the link by building the docs locally using the `make docs` webserver. Raw Output: {"message":"The link '{{< relref \"./configure-grafana-enterprise-metrics\" >}}' references a page in the project that doesn't exist.\nCheck if the page has moved within the repository.\n\nVerify the link by building the docs locally using the `make docs` webserver.","location":{"path":"docs/sources/helm-charts/mimir-distributed/configure/configure-gem-federation-frontend.md","range":{"start":{"line":17,"column":102},"end":{"line":17,"column":197}}},"severity":1,"source":{"name":"doc-validator"},"code":{"value":"link-does-not-exist"}}
doc-validator
Process completed with exit code 1.
test-docs / test-docs
Process completed with exit code 2.
lint
Process completed with exit code 2.
test (1, 4)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
test (1, 4)
The operation was canceled.
test (0, 4)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
test (0, 4)
The operation was canceled.
test (2, 4)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
test (2, 4)
The operation was canceled.
integration (4, 6)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
integration (4, 6)
The operation was canceled.
integration (2, 6)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
integration (2, 6)
The operation was canceled.
integration (3, 6)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
integration (3, 6)
The operation was canceled.
integration (5, 6)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
integration (5, 6)
The operation was canceled.
integration (1, 6)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
integration (1, 6)
The operation was canceled.
integration (0, 6)
Canceling since a higher priority waiting request for '10059/merge-docs/helm-docs-usability' exists
integration (0, 6)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
Docker Images
283 MB
Race-enabled Mimir
77.3 MB