Skip to content

Phase 1: Specification and Design (October 18., 2020)

Mihály Dobos-Kovács edited this page Oct 18, 2020 · 3 revisions

This page contains the links to the documents submitted for the first phase of the homework.

Note: The links in this page point to the versions of the documents on October 18., 2020, not the latest revision. To access the latest version, use the sidebar or the home page. However, the link in the documents accessed from this page might point to the latest revisions of their linked documents.

Clone this wiki locally